Tom, Ron, Rich, and I were able to get all of the walls sanded and we applied the second coat of mud to the 8 foot wall. Ron also installed all three electric door strikes for our access control system. On Tuesday we will be sanding and painting the 8 foot wall. If enough people show up on Tuesday to help we will also apply the second coat of mud to the 20 foot wall.